28 metres of KERBEYE installed for Tarmac.

Installed in a black and yellow colour scheme with green reflectors used to indicate the correct way of entrance and red reflectors used for the incorrect way of entrance. White reflectors were installed in between to indicate the raised infrastructure and enable reflective visual navigation onto the weigh-bridge.

Previous
Previous

Hatton Traffic Management - HS2

Next
Next

Tarmac